FSTTRK 234-236 Congress ST
Sector: Commercial • Location: Boston, Massachusetts, United States of America
Source: City of Boston
8th floor interior demolition of an existing vacant tenant suite. Work to include demolition of existing arch finishes, i.e. GWB walls, ACT ceilings, flooring, turning up of existing sprinkler heads to upright position (no new or relocated sprinkler heads), minor MEP demolition for new layout. New and ETR fire alarm devices to be supported per code. New work to include drywall patching and install
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about FSTTRK 234-236 Congress ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | 8th floor interior demolition of an existing vacant tenant suite. Work to include demolition of existing arch finishes, i.e. GWB walls, ACT ceilings, flooring, turning up of existing sprinkler heads to upright position (no new or relocated sprinkler heads), minor MEP demolition for new layout. New and ETR fire alarm devices to be supported per code. New work to include drywall patching and installing drywall partitions at perimeter only. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
