FSTTRK 280-294 Congress ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
PLEASE REFERENCE APPLICATION ALT71435 FOR BOARD OF APPEAL DECISION RELATING TO THE STAIR THAT IS ASSOCIATED WITH THIS PROJECT. Interior Fit Out on the first and second floor at 290 Congress Street. - Relocation of sprinkler piping and addition of branch piping and heads - Reconfiguration of HVAC ductwork; installation of HVAC equipment - Tie into existing electrical panels; installation of light f
- Status
- Prospective
- Sector
- Road, Water Supply and Storage, Power Generation (CCGT), Cement, Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about FSTTRK 280-294 Congress ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | PLEASE REFERENCE APPLICATION ALT71435 FOR BOARD OF APPEAL DECISION RELATING TO THE STAIR THAT IS ASSOCIATED WITH THIS PROJECT. Interior Fit Out on the first and second floor at 290 Congress Street. - Relocation of sprinkler piping and addition of branch piping and heads - Reconfiguration of HVAC ductwork; installation of HVAC equipment - Tie into existing electrical panels; installation of light fixtures, power, AV, tel data, fire alarm and life safety devices - Addition of plumbing fixtures (sinks, faucets, water heater) and associated piping - Reconfiguration of storefront for entry door - Drywall and glass partitions; ACT ceilings; polished concrete floors and carpet; solid core doors. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Power Generation (CCGT), Cement, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
