FSTTRK 33-59 Congress ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
Interior renovation to existing office space on the 2nd thru 5th floors. Total square footage to be renovated is 94,800 sqft. Proposed work to include installation of interior non load bearing partitions, doors, suspended gypsum and open ceilings and related finishes. Structural work to entail the construction of communicating stair, ADA ramps and creation of access to existing outdoor area to be
- Status
- Prospective
- Sector
- Road, Water Supply and Storage, Seaport, Residential, Commercial, Government, Manufacturing (Industrial)
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about FSTTRK 33-59 Congress ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Interior renovation to existing office space on the 2nd thru 5th floors. Total square footage to be renovated is 94,800 sqft. Proposed work to include installation of interior non load bearing partitions, doors, suspended gypsum and open ceilings and related finishes. Structural work to entail the construction of communicating stair, ADA ramps and creation of access to existing outdoor area to be used as an accessory to the office space. Modification to existing HVAC system, electrical system, plumbing fixtures, pantry equipment, telephone/data ports, and lighting fixtures. Also known as 40 Water Street. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Seaport, Residential, Commercial, Government, Manufacturing (Industrial) |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
