FSU Marine Lab Potable Water Pipe Replacement
Closed · Florida · Last reported Aug 2024
Source: Dodge USA
Replacement of the domestic cold and hot water line to the 0408 Lab Research building at the FSU Marine Lab, as specified in the Construction Documents. Currently the piping is galvanized pipe with repairs and additions in CPVC piping. The FSU Marine Lab is located at 3618 US-98, St. Teresa, FL 32358
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Government, Manufacturing (Industrial), Seaport
- Location
- Carrabelle, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FSU Marine Lab Potable Water Pipe Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replacement of the domestic cold and hot water line to the 0408 Lab Research building at the FSU Marine Lab, as specified in the Construction Documents. Currently the piping is galvanized pipe with repairs and additions in CPVC piping. The FSU Marine Lab is located at 3618 US-98, St. Teresa, FL 32358 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Carrabelle |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Government, Manufacturing (Industrial), Seaport |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
