Fujian Anxi Longmen Town Wastewater Treatment Plant

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Active

On 26 January 2011, a local private company, South Water Co., Ltd. was formally granted a 30 year agreement to build and operate a wastewater treatment plant in Longmen Town, Anxi County, Fujian Province. The agreement was procured on a competitive basis. Three private developers including South Water were short listed on 30 December 2010. The bidding results were publically disclosed in January 2

Status
Prospective
Sector
Water Supply and Storage, Commercial, Government, Waste Processing and Treatment
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Fujian Anxi Longmen Town Wastewater Treatment Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Fujian Anxi Longmen Town Wastewater Treatment Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

On 26 January 2011, a local private company, South Water Co., Ltd. was formally granted a 30 year agreement to build and operate a wastewater treatment plant in Longmen Town, Anxi County, Fujian Province. The agreement was procured on a competitive basis. Three private developers including South Water were short listed on 30 December 2010. The bidding results were publically disclosed in January 2011. The short term capacity of the facility is 25,000 cubic meters per day (which is further divided into two phases, with the first phase of a capacity of 12,500 cubic meters per day) and the long term capacity is 50,000 cubic meters per day. A project company, Anxi South Water Co., Ltd. was registered on 10 May 2011 to conduct the project and it planned to finish the project by the end of 2011. By August 2011, 6.6km long associated distribution network has been completed and it was expected that the project could be completed on time. The project company started to recruit operation workers from April 2011. The total investment on the project is still unknown. South Water has a 100% stake in the project. According to an official document in Oct 2011, the construction of the project had been progressing very fast.

Original sector

Water and sewerage

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Government, Waste Processing and Treatment

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project