Fujian Keraniganj HFO Power Plant
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
Fujian Longking Company and Dhaka West Power (subsidiary of Maisha Group) are to build the 108MW Keraniganj furnace oil-fired power plant, and sell the power to BPDB at Tk6.92/kWh for a period of 15 years.
The project was reported as producing power by July 2012. The fuel is HFO, not diesel (but that is not in the list, so listed as diesel, the closest substitute). The contract was agreed to by
- Status
- Prospective
- Sector
- Commercial, Oil and Gas, Government, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Rajshahi, Bangladesh
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Fujian Keraniganj HFO Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Fujian Longking Company and Dhaka West Power (subsidiary of Maisha Group) are to build the 108MW Keraniganj furnace oil-fired power plant, and sell the power to BPDB at Tk6.92/kWh for a period of 15 years. The project was reported as producing power by July 2012. The fuel is HFO, not diesel (but that is not in the list, so listed as diesel, the closest substitute). The contract was agreed to by the government in September 2011. Total cost was estimated at US$59.2 million, based on 15 year contract, 10% interest rate, US$600k per MW. The Financial Express (Bangladesh), Purchase Body meet okays four IPP projects, 9 September 2011. |
Original sector | Energy |
Budget |
Location
Country | Bangladesh |
State | Rajshahi |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Oil and Gas, Government, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-05-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
