Fukuoka Prefecture / Prefectural road intermediate water winding line Preliminary design of bridge will begin in 2023, 400m of construction will be completed on Onga River
Sector: Bridge • Location: Japan
Source: Fukuoka Prefecture
Fukuoka Prefecture will begin surveying intermediate water windings on general prefectural roads and preliminary design of roads and bridges this fiscal year. The project area is approximately 3.1 km long, from Ora, Onga Town to Iwase Nishicho, Nakama City. Approximately 400 meters of new bridge will be constructed over the Onga River.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Fukuoka Prefecture will begin surveying intermediate water windings on general prefectural roads and preliminary design of roads and bridges this fiscal year. The project area is approximately 3.1 km long, from Ora, Onga Town to Iwase Nishicho, Nakama City. Approximately 400 meters of new bridge will be constructed over the Onga River. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
