Fuller Warren Bridge Replacement

Sector: Automotive • Location: Thailand

Source: Road Traffic Technology

Project
Closed

The new Fuller Warren Bridge in Jacksonville, Florida, USA, is an eight-lane, 1.4-mile-long bridge across the St. Johns River. The replacement bridge structure consists of 52 spans totalling more than 7,500ft. The 650ft channel unit is three continuous spans (200ft, 250ft, 200ft) made of 3ft to 80ft-deep modified bulb tee segments and two haunched pier segments. The superstructure is supported by

Project Information FAQ

Project Information

4 Q
The project “Fuller Warren Bridge Replacement” is an infrastructure initiative in the Automotive sector, located in Thailand. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The new Fuller Warren Bridge in Jacksonville, Florida, USA, is an eight-lane, 1.4-mile-long bridge across the St. Johns River. The replacement bridge structure consists of 52 spans totalling more than 7,500ft. The 650ft channel unit is three continuous spans (200ft, 250ft, 200ft) made of 3ft to 80ft-deep modified bulb tee segments and two haunched pier segments. The superstructure is supported by hammerhead type piers founded on 36ft, 48ft or 72ft diameter drilled shafts. The new bridge provides three lanes in each direction for the I-95 and an auxiliary lane in each direction for traffic to enter or exit the I-95. The new Fuller Warren Bridge in Jacksonville, Florida, USA, is an eight-lane, 1.4-mile-long bridge across the St. Johns River. Part of the I-95 interstate system, the project was sponsored by the Florida Department of Transportation (FDOT). One section of the new bridge was opened to traffic in April 2000 but it wasn’t until November 2002 that all eight lanes were fully opened. The bridge is eight lanes wide, four in each direction, and 1.4 miles long. It can carry approx. 100,000 vehicles per day. The new bridge replaced the Fuller Warren Bascule Bridge which had a substandard roadway width, required frequent repairs and was one of two stop conditions remaining on this major north-south expressway. The Fuller Warren Bascule Bridge was opened in 1954. It was a four-lane structure with no emergency lanes. The study for the new project was carried out in 1990 and the final design contract was awarded in 1992 to HNTB Corporation. CHARACTERISTICS AND COST The overall cost of the project was around $100 million. The replacement bridge structure consists of 52 spans totalling more than 7,500ft. The main span over the shipping channel is 250ft with a vertical clearance of 75ft. The new bridge provides three lanes in each direction for the I-95 and an auxiliary lane in each direction for traffic to enter or exit the I-95. Four, 10ft shoulders are provided. Approach spans, with a few exceptions, are 140ft long and use 78ft modified bulb tee beams made continuous for live load. At the east end of the project an existing bridge over the FEC railroad, constructed with steel beams, was widened. Elastomeric bearing pads were used throughout the project except at the three-span channel unit where pot bearings were installed. Seismic continuity between the super and sub-structure is provided by 1ft 6in-diameter dowels cast into and projecting out of the top of the pier caps. The projecting dowels reside inside 8ft x 4ft structural tube sections cast into the bottom surface of end diaphragms. The superstructure is supported by hammerhead type piers founded on 36ft, 48ft or 72ft diameter drilled shafts. The land pier columns are cast-in-place. The river pier columns and all of the beams on the project were precast at a yard set up. CHANNEL UNIT The 650ft channel unit is three continuous spans (200ft, 250ft, 200ft) made of 3ft to 80ft-deep modified bulb tee segments and two haunched pier segments. The haunched pier segments transition from 120ft deep at the piers to 80ft deep at the ends. ERECTION METHOD The erection method used for the channel unit called for a temporary support system using temporary piers to support the haunched pier segments and ‘strongbacks’ to support the end segments and centre segments (drop-in-beams). The project was architecturally enhanced by understating pier cap strength with post-tensioning, using buttresses and copings at pier cap to column connections, shaping pier columns using octagonal shapes and rustication, and finally by coating all viewable concrete surfaces. LEAD CONTRACTORS HNTB Corporation designed the bridge. Balfour Beatty Construction, Inc. was the lead contractor. Parsons Brinckerhoff CS, Inc. provided construction inspection services. Balfour Beatty also demolished the old four-lane bridge.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data