Fullerton Transportation Center Ctr Pkg Lots Access Imp
Sector: Car parking • Location: Fullerton, California, United States of America
Source: Dodge USA
The Work shall consist of, but not limited to, removing and constructing concrete sidewalk and hardscape, accessible pedestrian ramp with handrails, removing and constructing curb ramp, removing and construction of new asphalt concrete pavement, pavement seal coating, signing and striping, and all related work
- Status
- Closed
- Sector
- Car parking, Road, Cement, Consumer Products, Automotive, Government, Commercial, Residential
- Location
- Fullerton, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fullerton Transportation Center Ctr Pkg Lots Access Imp
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work shall consist of, but not limited to, removing and constructing concrete sidewalk and hardscape, accessible pedestrian ramp with handrails, removing and constructing curb ramp, removing and construction of new asphalt concrete pavement, pavement seal coating, signing and striping, and all related work |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Fullerton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Cement, Consumer Products, Automotive, Government, Commercial, Residential |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
