Fulton County/Ritter Station Solar Project
Sector: Solar • Location: Fayette, Ohio, United States of America
Source: Dodge
Utility-scale solar project in Gorham Township, Fulton County, Ohio with up to 199 megawatts (MW) of solar energy. The solar project will be connected to the East Fayette Substation via a 2.2-mile-long, 138 kilovolt transmission line that will be sited wholly within the project boundary.
- Status
- Prospective
- Sector
- Solar, Power Transmission, Commercial, Power Generation (CCGT)
- Location
- Fayette, Ohio, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Fulton County/Ritter Station Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Utility-scale solar project in Gorham Township, Fulton County, Ohio with up to 199 megawatts (MW) of solar energy. The solar project will be connected to the East Fayette Substation via a 2.2-mile-long, 138 kilovolt transmission line that will be sited wholly within the project boundary. |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Fayette |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Solar, Power Transmission, Commercial, Power Generation (CCGT) |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
