Fulton Park Pool Facilities Replacement
Sector: Car parking • Location: Waterbury, Connecticut, United States of America
Source: Dodge USA
A. The general intent of the Work is: 1. Remove and dispose of the existing pavements, curbing, soil, and lawn. Remove or prune selected trees. Clear and grub vegetated slopes. Remove and dispose of existing pool, deck, and pump house, and associated infrastructure. Existing Bathhouse shell structure and foundation shall remain. 2. Construct new pool, pumphouse and associated infrastructure. Renov
- Status
- Closed
- Sector
- Car parking, Consumer Products, Road, Automotive, Government, Commercial, Manufacturing (Industrial)
- Location
- Waterbury, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fulton Park Pool Facilities Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A. The general intent of the Work is: 1. Remove and dispose of the existing pavements, curbing, soil, and lawn. Remove or prune selected trees. Clear and grub vegetated slopes. Remove and dispose of existing pool, deck, and pump house, and associated infrastructure. Existing Bathhouse shell structure and foundation shall remain. 2. Construct new pool, pumphouse and associated infrastructure. Renovate existing Bath house structure. Remove portion of bath house exterior wall to accommodate new ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Waterbury |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Consumer Products, Road, Automotive, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
