logo

Fundao-Santa Clara Hydroelectric Complex

Sector: Hydro • Location: Brazil

Source: World Bank Group

Project
Active

The project comprises contruction and operation of two hydroeletric plants: Fundao(119MW) and Santa Clara(119MW). They will be 15KM apart in the Jordao River in the Parana State. The concession was originally awarded to Triunfo. The concession contract was signed in 2001 and the construction works started in 2002. The first plant was expected to start operations in 2004 and the second in 2005.

Status
Prospective
Sector
Hydro, Cable car, Power Generation (CCGT), Telecommunications, Power Transmission, Government, Residential, Automotive, Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Fundao-Santa Clara Hydroelectric Complex

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Fundao-Santa Clara Hydroelectric Complex” is an infrastructure initiative in the Hydro sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project comprises contruction and operation of two hydroeletric plants: Fundao(119MW) and Santa Clara(119MW). They will be 15KM apart in the Jordao River in the Parana State. The concession was originally awarded to Triunfo. The concession contract was signed in 2001 and the construction works started in 2002. The first plant was expected to start operations in 2004 and the second in 2005. The company responsible for the project is Centrais Eletricas do Rio Jordao (Elejor). Elejor was originally composed by Construtora Triunfo S/A. In July 2002, Copel (a partially privatized utility in the state of Parana) and Paineira (a group of local investors) became shareholders of Elejor. In September 2002, Eletrobras, a state-owned utility, acquired 50% of the total capital (89% of the preferred or non-voting shares) of Elejor through a capital increase. The other 50% was held by Copel Participacoes S/A (20%), Triunfo Participacoes e Investimentos S/A (15%) and Paineira Participacoes e Empreendimentos S/A (15%). In December 2003, COPEL increasing its stake to 35% of the total capital (70% of the voting capital) and took the control of Elejor by acquiring Triunfo's stake in the company (15% of the total capital and 30% of the voting capital). Elejor signed a PPA to sell 81% of the power generated in both plants to COPEL. In 2005, BNDES acquired bonds of Elejor worth US$ 109.2 million (BRL 265,4 million) (these bonds could be converted into shares). The Santa Clara unity began to operate in July 2005, and the Fundao one in August 2006.

Original sector

Energy

Procurement method

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Cable car, Power Generation (CCGT), Telecommunications, Power Transmission, Government, Residential, Automotive, Commercial

Article published date

2024-09-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project