logo

Fuyang waste-to-energy project Phase I in Zhejiang Province

Sector: Water Supply and Storage • Location: Zhejiang, China

Source: InfraPPPWorld

Project
Project Awarded

The project involves the development of Fuyang waste-to-energy facility Phase I in Zhejiang Province. Fuyang Project is located in the circular economy industrial park of Fuyang District in Hangzhou City, Zhejiang Province. The project will be invested in and constructed based on the PPP model by a project company, in which Everbright International holds a 49% stake. With a concession period of 30

Project Information FAQ

Project Information

4 Q
The project “Fuyang waste-to-energy project Phase I in Zhejiang Province” is an infrastructure initiative in the Water Supply and Storage sector, located in Zhejiang, China. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

project awarded

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the development of Fuyang waste-to-energy facility Phase I in Zhejiang Province. Fuyang Project is located in the circular economy industrial park of Fuyang District in Hangzhou City, Zhejiang Province. The project will be invested in and constructed based on the PPP model by a project company, in which Everbright International holds a 49% stake. With a concession period of 30 years (construction period inclusive), the project is designed with a daily waste processing capacity of 2,250 tonnes and will be constructed in two phases. Fuyang Project Phase I has a designed daily waste processing capacity of 1,500 tonnes. To be equipped with two 750 tonnes/day grate furnaces and a 40MW turbine power generator, Fuyang Project Phase I is expected to generate green electricity of approximately 180 million kWh annually. The gas emissions will fully comply with relevant national standards, with the daily average level of online monitored gas emissions superior to the Euro 2010 standard.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data