Fuzhou CWC Water Company Limited
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
In March of 2004, Fuzhou CWC Water Company Limited (Fuzhou CWC) won a 30-year concession contract for the operations and management of the Fuzhou Economic & Technological Development Zone (FETDZ) Water Supply Company, following a public tender lead by the Property Right Transaction Institution of Fujian Province. The utility had a daily capacity of 125,000 tonnes of water.
Fuzhou CWC was est
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Transmission, Government, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Fujian, China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Fuzhou CWC Water Company Limited
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In March of 2004, Fuzhou CWC Water Company Limited (Fuzhou CWC) won a 30-year concession contract for the operations and management of the Fuzhou Economic & Technological Development Zone (FETDZ) Water Supply Company, following a public tender lead by the Property Right Transaction Institution of Fujian Province. The utility had a daily capacity of 125,000 tonnes of water. Fuzhou CWC was established in early 2004 and was a Sino-foreign cooperative joint venture between China Water Company (CWC) (72%) and the state-owned FETDZ Baimei Water Supply Company Limited (Baimei Company) (28%). CWC, in turn, was owned by the UK's RWE-Thames Water (48.8%) and Sime Darby of Malaysia (33.3%) by 2002. The registered capital of Fuzhou CWC was RMB 210 million (US$25.4 million), of which RMB 150 million (US$18 million) was contributed by CWC. The transfer of assets commenced on 27 December 2004, when operation of the utility was successfully handed over to Fuzhou CWC. http://www.invest-inchina.com/english/InvestmentNews/news_info.asp?id=100822 None |
Original sector | Water and sewerage |
Procurement method | |
Budget |
Location
Country | China |
State | Fujian |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Government, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in China
- Three Gorges Dam Hydro Electric Power Plant China
- Taishan Nuclear Power Plant
- Tianwan Nuclear Power Plant Lianyungang
- Zhenan PumpedStorage Power Project
- Xiluodu Hydroelectric Power Plant
- Hynix China Project Clean Room Package
- Yichun Economic Development Zone Sewage Comprehensive Treatment Plant
- Baoying Waste-to-Energy plant
