logo

FW JI·The Covered Bridge on Aqueduct / IARA

Sector: Forest Products and Packaging • Location: China

Source: ArchDaily

Project
Closed

To cherish the collective memory of the village, we preserved the original aqueduct, maintaining its original structure and the traces of time imprinted on its surface. On the body of the old aqueduct, we attached a lightweight wooden bridge body. The use of wood not only pays homage to the local tradition of Huizhou architecture but also enhances the intimacy between the new infrastructure and th

Project Information FAQ

Project Information

3 Q
The project “FW JI·The Covered Bridge on Aqueduct / IARA” is an infrastructure initiative in the Forest Products and Packaging sector, located in China. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

To cherish the collective memory of the village, we preserved the original aqueduct, maintaining its original structure and the traces of time imprinted on its surface. On the body of the old aqueduct, we attached a lightweight wooden bridge body. The use of wood not only pays homage to the local tradition of Huizhou architecture but also enhances the intimacy between the new infrastructure and the villagers.The roof employs lightweight corrugated panels, resting on the wooden structure. Inside the bridge, there are seats and two rows of reclining chairs, providing villagers with different options for resting and enjoying the view. In terms of construction, all components of the bridge can be lifted by hand, avoiding the need for large construction tools. All joints between wooden components are connected with bolts for easy on-site assembly." The Covered Bridge on Aqueduct" utilizes prefabricated cross-laminated timber (CLT), a new material that offers advantages such as uniform stress distribution, high strength-to-weight ratio, and environmental friendliness. The bridge structure consists of 19 small cross-sectional interlocking units, forming a ribbed system intertwined with the old aqueduct. Each structural unit is composed of two independent X-shaped columns that support their respective roofs.Text description provided by the architects.The project is located in Fengwu Village, Biyang Town, Yixian County,Huangshan City. As the most well-preserved area of traditional villages in southern Anhui, Yixian County boasts rich natural landscapes and cultural heritage. However, Fengwu Village grapples with challenges common to many ordinary villages, including population outflow, aging demographics, and limited preservation of ancient buildings. In 2023, we initiated the rural revitalization charity project " Fengwu JI". By leveraging design, the initiative takes an international perspective, focusing on local characteristics and employing methods like micro-renewal and the construction of rural culture. The goal is to foster collective efforts, enriching and revitalizing the lives of Fengwu's residents and the broader rural community. "The Covered Bridge on Aqueduct" is one of the sub-projects within this initiative.Upon completion, the bridge serves as a respectful tribute and a reminder of a specific history in the village. It also provides a nurturing and gathering space for the village's future, injecting vitality and vigor into the public life of Fengwu Village.This project is located along the old water channel in the northern part of the village. The old water channel, constructed in the 1960s for irrigation, stands abandoned today. The surroundings of the aqueduct are naturally wild and lush, creating a unique genius loci. During the initial design phase, we conducted surveys with villagers, and “memory’ was the most frequently mentioned word. These memories included recollections of the collective construction of the old water channel and fond memories of playing around the channel during childhood. Additionally, villagers expressed the need for a space to eat and seek shade during the summer. Therefore, we decided to transform this aqueduct into a comfortable public covered bridge for daily use.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data