FY 2019-MERIWETHER COUNTY-SEC.5311-REPLACEMENT VEHICLE
Sector: Automotive • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This project will fund one (1) Shuttle Van with Lift (Replacement for totaled vehicle #3715) utilizing funding available through the Federal Transit Administration's Section 5311 Program.
- Status
- Under Construction
- Sector
- Automotive, Power Transmission, Government, Power Generation (CCGT)
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about FY 2019-MERIWETHER COUNTY-SEC.5311-REPLACEMENT VEHICLE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will fund one (1) Shuttle Van with Lift (Replacement for totaled vehicle #3715) utilizing funding available through the Federal Transit Administration's Section 5311 Program. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Automotive, Power Transmission, Government, Power Generation (CCGT) |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
