FY 2022-2023 Cast Iron Sewer Replacement Package I
Sector: Metal • Location: San Jose, California, United States of America
Source: Dodge USA
The Project generally involves removal and replacement of approximately 1,770 linear feet of 6-inch and 8-inch Cast Iron pipe. The segments to be removed and replaced will be replaced with more durable Ductile Iron pipe and Vitrified Clay pipe.
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Waste Processing and Treatment, Government, Steel, Commercial
- Location
- San Jose, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FY 2022-2023 Cast Iron Sewer Replacement Package I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project generally involves removal and replacement of approximately 1,770 linear feet of 6-inch and 8-inch Cast Iron pipe. The segments to be removed and replaced will be replaced with more durable Ductile Iron pipe and Vitrified Clay pipe. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Jose |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Waste Processing and Treatment, Government, Steel, Commercial |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
