Fy 2023-2024 Cast Iron Sewer Replacement Package III
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Project generally involves removal of approximately 860 linear feet of existing 6-inch corroded Cast Iron Vitrified Clay pipes and the lining of approximately 390 linear feet of Cast Iron and Vitrified Clay pipes with CIPP liner. The segments to be removed and replaced will be replaced with more durable Vitrified Clay pipe.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Government, Metal, Steel
- Location
- San Jose, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fy 2023-2024 Cast Iron Sewer Replacement Package III
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project generally involves removal of approximately 860 linear feet of existing 6-inch corroded Cast Iron Vitrified Clay pipes and the lining of approximately 390 linear feet of Cast Iron and Vitrified Clay pipes with CIPP liner. The segments to be removed and replaced will be replaced with more durable Vitrified Clay pipe. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Jose |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Government, Metal, Steel |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
