logo

FY 2023-2024 Sanitary Sewer Repairs Package I

Sector: Water Supply and Storage • Location: San Jose, California, United States of America

Source: Dodge USA

Project
Bid Results

The Project will evaluate the condition of 45 selected 6-inch, 8-inch and 10-inch diameter Vitrified Clay Pipe (VCP) sanitary sewer segments, approximately 12,900 linear feet. Will also perform approximately 150 linear feet of point repairs, construct 6 new Manholes, rehabilitate 11 manholes, remove and replace 1 drop manhole and will install 12,900 linear feet of Cured In Place Pipe liner (CIPP).

Status
Closed
Sector
Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
Location
San Jose, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about FY 2023-2024 Sanitary Sewer Repairs Package I

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “FY 2023-2024 Sanitary Sewer Repairs Package I” is an infrastructure initiative in the Water Supply and Storage sector, located in San Jose, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project will evaluate the condition of 45 selected 6-inch, 8-inch and 10-inch diameter Vitrified Clay Pipe (VCP) sanitary sewer segments, approximately 12,900 linear feet. Will also perform approximately 150 linear feet of point repairs, construct 6 new Manholes, rehabilitate 11 manholes, remove and replace 1 drop manhole and will install 12,900 linear feet of Cured In Place Pipe liner (CIPP).

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

San Jose

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Commercial, Waste Processing and Treatment

Article published date

2024-11-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project