FY 2024-25 Concrete Replacement Program
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The work necessary for the completion of this contract consists of the following: Distributing door hanger notifications Placing No Parking signs and traffic control Posting tree removal signs Saw cutting and removing concrete sidewalks, parkways, driveways, access ramps, cross gutters, curbs and gutters Constructing new concrete sidewalks, parkways, driveways, access ramps, cross gutters, curbs a
- Status
- Closed
- Sector
- Government, Cement, Consumer Products, Power Transmission, Power Generation (CCGT), Road, Car parking, Commercial, Automotive
- Location
- Newport Beach, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FY 2024-25 Concrete Replacement Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work necessary for the completion of this contract consists of the following: Distributing door hanger notifications Placing No Parking signs and traffic control Posting tree removal signs Saw cutting and removing concrete sidewalks, parkways, driveways, access ramps, cross gutters, curbs and gutters Constructing new concrete sidewalks, parkways, driveways, access ramps, cross gutters, curbs and gutters (utilizing pump if necessary) Saw cutting and removing existing concrete staircase and... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Newport Beach |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Cement, Consumer Products, Power Transmission, Power Generation (CCGT), Road, Car parking, Commercial, Automotive |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
