logo

FY 2024-25 Slurry Seal Project

Sector: Government • Location: Norco, California, United States of America

Source: Dodge

Project
Bidding

The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consist of weed abatement, crack sealing, slurry sealing, pavement markings, localized full depth pavement repairs, and striping, on various streets in the Cit

Status
Prospective
Sector
Government, Road, Manufacturing (Industrial), Commercial
Location
Norco, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about FY 2024-25 Slurry Seal Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “FY 2024-25 Slurry Seal Project” is an infrastructure initiative in the Government sector, located in Norco, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consist of weed abatement, crack sealing, slurry sealing, pavement markings, localized full depth pavement repairs, and striping, on various streets in the City and all appurtenant related work to the satisfaction and acceptance of the City Engineer.

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Norco

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Road, Manufacturing (Industrial), Commercial

Article published date

2025-01-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project