logo

FY 2024 Paving Improvements

Sector: Road • Location: Waycross, Georgia, United States of America

Source: Dodge USA

Project
Closed

The Work to be completed for the FY 2024 Paving Improvements is described briefly as follows: The project consists of (but is not limited to) approximately 57,100 SY of asphalt milling; 6,550 TN of 9.5mm asphalt pavement; 11,545 SY of Full Depth Reclamation; 325 TN open graded interlayer (OGI); manhole frame and cover replacements and adjustments to grade; valve box adjustments to grade; driveway

Status
Closed
Sector
Road, Waste Processing and Treatment, Commercial, Water Supply and Storage, Government, Manufacturing (Industrial)
Location
Waycross, Georgia, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about FY 2024 Paving Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “FY 2024 Paving Improvements” is an infrastructure initiative in the Road sector, located in Waycross, Georgia, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Work to be completed for the FY 2024 Paving Improvements is described briefly as follows: The project consists of (but is not limited to) approximately 57,100 SY of asphalt milling; 6,550 TN of 9.5mm asphalt pavement; 11,545 SY of Full Depth Reclamation; 325 TN open graded interlayer (OGI); manhole frame and cover replacements and adjustments to grade; valve box adjustments to grade; driveway apron adjustments; pavement striping, long & short-side water service transfers; 300 LF 8" gravit...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Georgia

City

Waycross

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Waste Processing and Treatment, Commercial, Water Supply and Storage, Government, Manufacturing (Industrial)

Article published date

2024-08-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project