Fy 22-23 Bowman Rd
Sector: Water Supply and Storage • Location: Mosquero, New Mexico, United States of America
Source: Dodge USA
Scope of Work BOWMAN RD START AT ANDERSON GOING WEST (1.5 Miles) 0.0 Miles Begin Blading and Shaping 20 wide 1.5 Miles stop blading and shaping roadway. 1.5 miles, blade & shape approximately 17,600 sq. yds. Pit Run surfacing (caliche) 18 wide 6 deep (compacted) 1.5 miles, pit run surfacing 2904 cyds. Do not leave any large rocks in ditches Minimum 120 belly dump loads per mile; material must reac
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Scope of Work BOWMAN RD START AT ANDERSON GOING WEST (1.5 Miles) 0.0 Miles Begin Blading and Shaping 20 wide 1.5 Miles stop blading and shaping roadway. 1.5 miles, blade & shape approximately 17,600 sq. yds. Pit Run surfacing (caliche) 18 wide 6 deep (compacted) 1.5 miles, pit run surfacing 2904 cyds. Do not leave any large rocks in ditches Minimum 120 belly dump loads per mile; material must reach bottom of ditch |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
