logo
ProjectClosed

FY 23 Small AC Force Main Replacement Phase 1

Closed · Florida · Last reported Mar 2024

Source: Dodge USA

Construction of Lift Stations 19 (Poinciana Drive and Bay Shore Road), 46 (Lockwood Ridge Road and 15th Street) and 55 (Palmetto Lane and Hampton Road) Force Main Replacements.

Status
Closed
Sector
Road, Waste Processing and Treatment, Government, Commercial, Water Supply and Storage
Location
Sarasota, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about FY 23 Small AC Force Main Replacement Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “FY 23 Small AC Force Main Replacement Phase 1” is an infrastructure initiative in the Road sector, located in Sarasota, Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction of Lift Stations 19 (Poinciana Drive and Bay Shore Road), 46 (Lockwood Ridge Road and 15th Street) and 55 (Palmetto Lane and Hampton Road) Force Main Replacements.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Sarasota

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Waste Processing and Treatment, Government, Commercial, Water Supply and Storage

Article published date

2024-03-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project