logo

FY 23/24 CIP Street Resurfacing

One of 10,000+ projects Taiyo tracks in North Carolina.

Source: Dodge USA

Project
Closed

S. Memorial Ave: consists of paving of approximately 54,300 square feet of asphalt surface overlay including S. Memorial Ave. between the E Bainbridge St and E Hollowell St. located in the Old Nags Head Place Subdivision Nags Head, North Carolina. Paving thickness will be comprised of 1 thickness, a minimum 4 wide asphalt edge milling for concrete driveway transitions and a minimum 12 wide asphalt

Status
Closed
Sector
Cement, Road, Government, Commercial, Manufacturing (Industrial)
Location
Nags Head, North Carolina, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about FY 23/24 CIP Street Resurfacing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “FY 23/24 CIP Street Resurfacing” is an infrastructure initiative in the Cement sector, located in Nags Head, North Carolina, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

S. Memorial Ave: consists of paving of approximately 54,300 square feet of asphalt surface overlay including S. Memorial Ave. between the E Bainbridge St and E Hollowell St. located in the Old Nags Head Place Subdivision Nags Head, North Carolina. Paving thickness will be comprised of 1 thickness, a minimum 4 wide asphalt edge milling for concrete driveway transitions and a minimum 12 wide asphalt milling for street intersection pavement transitions. E Curlew St.: consists of paving of approx...

Procurement method

Budget

Location

Country

United States of America (USA)

State

North Carolina

City

Nags Head

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Cement, Road, Government, Commercial, Manufacturing (Industrial)

Article published date

2024-03-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project