FY 23/24 Fire Hydrant
Sector: Water Supply and Storage • Location: Prescott Valley, Arizona, United States of America
Source: Dodge USA
Scope of Work The work consists of installation of up to 12 new fire hydrants within the Prescott Valley Water System. Each fire hydrant installation shall include all necessary work, staff, materials, and equipment, required to install the fire hydrant and all associated appurtenances, valves, fittings, piping, pressure testing, and total coliform sampling to make connections to the Town s water
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Prescott Valley, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FY 23/24 Fire Hydrant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of Work The work consists of installation of up to 12 new fire hydrants within the Prescott Valley Water System. Each fire hydrant installation shall include all necessary work, staff, materials, and equipment, required to install the fire hydrant and all associated appurtenances, valves, fittings, piping, pressure testing, and total coliform sampling to make connections to the Town s water system. A traffic control plan is required for each hydrant as part of a Prescott Valley Right-of... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Prescott Valley |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
