logo

FY 25 MCON Guam Defense System Upgrades

Sector: Aerospace & Defense • Location: Joint Base Pearl Harbor-Hickam, Hawaii, United States of America

Source: Dodge

Project
Bid Results

Design-bid-build of a Guam Defense Radar System Command Center (CC), power generation facility, switchgear building, fuel storage facility, entry control facility, and associated equipment. Design-bid-build of a Guam Defense Radar System Command Center (CC), power generation facility, switchgear building, fuel storage facility, entry control facility, and associated equipment.

Status
Closed
Sector
Aerospace & Defense, Manufacturing (Industrial), Commercial, Power Generation (CCGT), Seaport
Location
Joint Base Pearl Harbor-Hickam, Hawaii, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about FY 25 MCON Guam Defense System Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “FY 25 MCON Guam Defense System Upgrades” is an infrastructure initiative in the Aerospace & Defense sector, located in Joint Base Pearl Harbor-Hickam, Hawaii, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Design-bid-build of a Guam Defense Radar System Command Center (CC), power generation facility, switchgear building, fuel storage facility, entry control facility, and associated equipment. Design-bid-build of a Guam Defense Radar System Command Center (CC), power generation facility, switchgear building, fuel storage facility, entry control facility, and associated equipment.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Hawaii

City

Joint Base Pearl Harbor-Hickam

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Aerospace & Defense, Manufacturing (Industrial), Commercial, Power Generation (CCGT), Seaport

Article published date

2025-03-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project