FY 25 Pleasant St Extension Storm Drain Replacement
Sector: Water Supply and Storage • Location: Ludlow, Vermont, United States of America
Source: Dodge USA
Description: Replace approximately 280' of 18" culvert to 30". Replace 1- 2' square catch basin with 4 round catch basin. Pipe Ditch: Pipe cover shall be 2-feet with 6-inches of fine material over crown of pipe. Fine material around pipe shall be 3/4 inch or less. Lawn: Disturbed top soil shall be seeded and mulched. Bituminous Paving: All subbase for paving shall be 18-inches of compacted crushed
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Raw Materials, Government
- Location
- Ludlow, Vermont, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FY 25 Pleasant St Extension Storm Drain Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Description: Replace approximately 280' of 18" culvert to 30". Replace 1- 2' square catch basin with 4 round catch basin. Pipe Ditch: Pipe cover shall be 2-feet with 6-inches of fine material over crown of pipe. Fine material around pipe shall be 3/4 inch or less. Lawn: Disturbed top soil shall be seeded and mulched. Bituminous Paving: All subbase for paving shall be 18-inches of compacted crushed gravel. All road paving shall have 3-inch base and 1-inch finish. Culverts: Change existing pipe... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Vermont |
City | Ludlow |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Raw Materials, Government |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
