FY 25 Sidewalk Program
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
bids for the construction of the Fiscal Year (FY) 2025 CIP Sidewalks, to provide general contracting services that include, but are not limited to: mobilization, maintenance of traffic (vehicular and pedestrian), street closures, sidewalk construction, sidewalk and curb demolition and replacement, handicap ramp installation, rubber sidewalk installation, alley/driveway apron replacement, brick and
- Status
- Closed
- Sector
- Commercial, Car parking, Power Transmission, Road, Government, Automotive, Power Generation (CCGT)
- Location
- Richmond, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FY 25 Sidewalk Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | bids for the construction of the Fiscal Year (FY) 2025 CIP Sidewalks, to provide general contracting services that include, but are not limited to: mobilization, maintenance of traffic (vehicular and pedestrian), street closures, sidewalk construction, sidewalk and curb demolition and replacement, handicap ramp installation, rubber sidewalk installation, alley/driveway apron replacement, brick and mortar repair, pavement patching, tree root work, tree removal, stump removal, adjusting utility... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Richmond |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Car parking, Power Transmission, Road, Government, Automotive, Power Generation (CCGT) |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
