FY14 Pre-Disaster Mitigation
Sector: Water Supply and Storage • Location: United States of America
Source: Grants.gov
a. Program OverviewThe Pre-Disaster Mitigation (PDM) Program makes available federal funds to State, Local and Tribal Governments to implement and sustain cost-effective measures designed to reduce the risk to individuals and property from natural hazards, while also reducing reliance on Federal funding from future disasters.b. Program Priorities The development and update of hazard mitigation pl
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | archived |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | a. Program OverviewThe Pre-Disaster Mitigation (PDM) Program makes available federal funds to State, Local and Tribal Governments to implement and sustain cost-effective measures designed to reduce the risk to individuals and property from natural hazards, while also reducing reliance on Federal funding from future disasters.b. Program Priorities The development and update of hazard mitigation plans Cost-effective hazard mitigation projects that do not duplicate other hazard mitigation grant programsc. Program Objectives Minimize risk to the population and structures from future hazard events Reduce reliance on Federal funding from future disastersAllowable activities in support of PDM program objectives include: Hazard Mitigation Planning consistent with 44 CFR Part 201 Hazard Mitigation Projects:o Property Acquisition and Structure Demolition or Relocationo Structure Elevationo Dry Flood-Proofingo Minor Localized Flood Reduction Projectso Structural Retrofitting of Existing Buildingso Non-structural Retrofitting of Existing Buildingso Safe Room Constructiono Infrastructure Retrofito Soil Stabilizationo Wildfire MitigationGenerators and/or related equipment purchases (e.g., generator hook-ups) are eligible when the generator directly relates to the hazards being mitigated and is part of a larger project (e.g., elevation of a lift station).For the FY 2014 PDM program, a permanently installed generator that is a stand-alone project may be considered if the generator protects a critical facility and can be determined cost-effective via standard HMA benefit-cost methodology. Critical facilities may include police and fire stations, hospitals, and water and sewer treatment facilities. Portable generators are eligible provided that they meet all requirements as described in HMA Guidance. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
