logo

FY14 Safety Analysis of ECP Brake Equipment for Passenger Trains - Phase-II

Sector: Mass Transit • Location: United States of America

Source: Grants.gov

Project
Archived

Provide a grant to the American Public Transportation Association (APTA) for the purposes of supporting the conduct of a Preliminary Hazard Analysis (PHA), an Operating and Support Hazard Analysis (OSHA), a Safety Traceability Matrix and a Failure Modes, Effects and Criticality Analysis (FMECA) of a proposed American Public Transportation Association (APTA) Safety Standard for Electronically-Cont

Project Information FAQ

Project Information

4 Q
The project “FY14 Safety Analysis of ECP Brake Equipment for Passenger Trains - Phase-II” is an infrastructure initiative in the Mass Transit sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

archived

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Provide a grant to the American Public Transportation Association (APTA) for the purposes of supporting the conduct of a Preliminary Hazard Analysis (PHA), an Operating and Support Hazard Analysis (OSHA), a Safety Traceability Matrix and a Failure Modes, Effects and Criticality Analysis (FMECA) of a proposed American Public Transportation Association (APTA) Safety Standard for Electronically-Controlled Pneumatic Brake Equipment for use in passenger train applications according to established, recognized industry standards and methods. Expand work with the Brake Supplier to review and analyze the operating manuals, consequences of not applying the correct procedure for the operation, and maintenance tasks identified as mitigation in the PHA and FMECA. Work with the Brake Supplier to ensure the proposed mitigations are reasonable and can be implemented in the operating procedures being submitted to the railroad companies.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data