FY17 Penn-Farley Complex - Farley Building Loading Dock Reconstruction Project, MSDC
Sector: Automotive • Location: United States of America
Source: Grants.gov
The Grantee will construct three new loading docks that will be partly recessed within the building envelope of the Farley Building. The current loading dock is only twenty-five feet from the 31st Street sidewalk. This requires any delivery to block traffic while backing in and unloading. The new loading dock design is recessed within the building footprint eliminating this traffic conflict. Shift
- Status
- Closed
- Sector
- Automotive, Commercial, Car parking, Road, Government, Rail
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Grants.gov
ConstructChat
Ask ConstructChat about FY17 Penn-Farley Complex - Farley Building Loading Dock Reconstruction Project, MSDC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | archived |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Grantee will construct three new loading docks that will be partly recessed within the building envelope of the Farley Building. The current loading dock is only twenty-five feet from the 31st Street sidewalk. This requires any delivery to block traffic while backing in and unloading. The new loading dock design is recessed within the building footprint eliminating this traffic conflict. Shifting the loading docks will eliminate their interference with 31st Street and the sidewalk, smoothing traffic flow along 31st Street, reducing congestion and minimizing dwell times and air pollution caused by a back-up of vehicles blocked by truck loading. |
Location
Country | United States of America (USA) |
Source
Source reliability | High |
Source | Grants.gov |
URL |
More Details
Record type | Project |
Sector | Automotive, Commercial, Car parking, Road, Government, Rail |
Article published date | 2023-06-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
