FY2023-2024 Tracy Boulevard Rehabilitation
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The Project is located at Tracy Boulevard between Lowell Avenue and Grant Line Road. Work includes: Pavement repair, Pavement grinding and overlay, Pavement striping, Pavement markings, curb and gutter repair, concrete sidewalk repair, ADA curb ramp installation, driveway installation and modification, utility frames and covers adjustment to grade, APS Push button installation, and relocation of e
- Status
- Prospective
- Sector
- Power Transmission, Road, Car parking, Commercial, Automotive, Cement, Power Generation (CCGT), Government
- Location
- Tracy, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about FY2023-2024 Tracy Boulevard Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project is located at Tracy Boulevard between Lowell Avenue and Grant Line Road. Work includes: Pavement repair, Pavement grinding and overlay, Pavement striping, Pavement markings, curb and gutter repair, concrete sidewalk repair, ADA curb ramp installation, driveway installation and modification, utility frames and covers adjustment to grade, APS Push button installation, and relocation of existing Push Button. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Tracy |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Road, Car parking, Commercial, Automotive, Cement, Power Generation (CCGT), Government |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
