FY2023 Drainage Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Scope - The Project consists of: Installation of sub-surface drainage improvements at 8 locations within the corporate limits of Hammond, including about 8,284 LF of storm drain pipes (8712" to 36" diameter), 140 EA catch basins; installation of about 980 SY of 5W x 6" thick PC concrete sidewalks; removal/replacement of about 1,950 SY of 6" th PCC driveways and 8" th PCC street pavements; 8,700 SY
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Government, Automotive, Commercial, Raw Materials, Manufacturing (Industrial)
- Location
- Hammond, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FY2023 Drainage Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The Project consists of: Installation of sub-surface drainage improvements at 8 locations within the corporate limits of Hammond, including about 8,284 LF of storm drain pipes (8712" to 36" diameter), 140 EA catch basins; installation of about 980 SY of 5W x 6" thick PC concrete sidewalks; removal/replacement of about 1,950 SY of 6" th PCC driveways and 8" th PCC street pavements; 8,700 SY of slab-sod; and related work including limestone (500 TN), imported Backfill (700 CY); pavement... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | Hammond |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Government, Automotive, Commercial, Raw Materials, Manufacturing (Industrial) |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
