FY2023 LMIG SAP Off System Safety Improvements
Sector: Car parking • Location: Tifton, Georgia, United States of America
Source: Dodge USA
The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed FY2023 LMIG SAP Off System Safety Improvements. In general, construction consists of 12 streets totaling 11 linear miles of traffic striping, crosswalk striping, stop bar striping, and all associated measures for the complete project. This work will be awarded in one (1) contract
- Status
- Closed
- Sector
- Car parking, Road, Mass Transit, Automotive, Rail, Government, Commercial
- Location
- Tifton, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FY2023 LMIG SAP Off System Safety Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed FY2023 LMIG SAP Off System Safety Improvements. In general, construction consists of 12 streets totaling 11 linear miles of traffic striping, crosswalk striping, stop bar striping, and all associated measures for the complete project. This work will be awarded in one (1) contract with a 120 consecutive calendar day construction schedule. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Tifton |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Mass Transit, Automotive, Rail, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
