FY2024 LSLR Road Program
One of 10,000+ projects Taiyo tracks in Illinois.
Source: Dodge USA
RESURFACING LOCATIONS The following streets will require grinding and overlay in accordance with the accompanying typical sections and specifications. See the plan map for the locations of the streets. List of Streets that are to be ground three and a half inches (3 ) full depth, to expose an existing concrete base (including partial grinding of the concrete as necessary and paid for as HOT-MIX AS
- Status
- Closed
- Sector
- Cement, Road, Car parking, Automotive, Government, Commercial
- Location
- Waukegan, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FY2024 LSLR Road Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | RESURFACING LOCATIONS The following streets will require grinding and overlay in accordance with the accompanying typical sections and specifications. See the plan map for the locations of the streets. List of Streets that are to be ground three and a half inches (3 ) full depth, to expose an existing concrete base (including partial grinding of the concrete as necessary and paid for as HOT-MIX ASPHALT SURFACE REMOVAL COMPLETE) and replaced with two and a quarter inch (2 ) of binder course an... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Waukegan |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Car parking, Automotive, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
