FY2025 Maynard Paving Overlay
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Mill & Overlay and Pavement Reclamation with overlay on selected streets in Maynard, MA. The work consists of Pavement milling, pavement overlay, pavement reclamation with base and surface course paving, hot mix asphalt, berm, hot mix asphalt driveway, and milling mulch surface course on fifteen streets in the town of Maynard.
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Road, Government
- Location
- Maynard, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FY2025 Maynard Paving Overlay
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Mill & Overlay and Pavement Reclamation with overlay on selected streets in Maynard, MA. The work consists of Pavement milling, pavement overlay, pavement reclamation with base and surface course paving, hot mix asphalt, berm, hot mix asphalt driveway, and milling mulch surface course on fifteen streets in the town of Maynard. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Maynard |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Road, Government |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
