FY2025 MFT Road Resurfacing Program
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The work shall consist of roadway resurfacing including38,155 square yards of bituminous surface removal, 25,761pounds of Bituminous Materials (Tack Coat), 2,285 tons ofLeveling Binder, N50, 3,480 tons of Hot-Mix Asphalt SurfaceCourse, Mix D, N50, and other related work.
- Status
- Closed
- Sector
- Road, Government, Commercial
- Location
- Saint Charles, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FY2025 MFT Road Resurfacing Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work shall consist of roadway resurfacing including38,155 square yards of bituminous surface removal, 25,761pounds of Bituminous Materials (Tack Coat), 2,285 tons ofLeveling Binder, N50, 3,480 tons of Hot-Mix Asphalt SurfaceCourse, Mix D, N50, and other related work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Saint Charles |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
