logo

FY2026 DFW Airfield Remediation

Sector: Airport • Location: Dfw Airport, Texas, United States of America

Source: Dodge

Project
Bid Results

The Work of this Contract is comprised of demolition of existing pavements; construction of excavation and embankments, pavement subgrades, pavement base courses and concrete pavements; installation of pavement crack sealant; construction of pavement underdrains; and restoration of pavement striping and markings. Construction will be inside and outside of the Airport s Air Operations Area (AOA). T

Status
Closed
Sector
Airport, Road, Aerospace & Defense, Commercial, Cement, Hospital, Government
Location
Dfw Airport, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about FY2026 DFW Airfield Remediation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “FY2026 DFW Airfield Remediation” is an infrastructure initiative in the Airport sector, located in Dfw Airport, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Work of this Contract is comprised of demolition of existing pavements; construction of excavation and embankments, pavement subgrades, pavement base courses and concrete pavements; installation of pavement crack sealant; construction of pavement underdrains; and restoration of pavement striping and markings. Construction will be inside and outside of the Airport s Air Operations Area (AOA). The Contractor shall be responsible for reviewing all existing conditions associated with the Work...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Dfw Airport

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Airport, Road, Aerospace & Defense, Commercial, Cement, Hospital, Government

Article published date

2025-10-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project