FY22 Sidewalk Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This work includes construction of new sidewalks and a shared use path, curb ramps, curb and gutter, driveway pavement, tree removal, utility adjustments, and appurtenances at six (6) locations which were selected in the fiscal year 2022 Equity and Quality of Life Program. This project is funded with federal Community Development Block Grant funds and local funds.
- Status
- Closed
- Sector
- Car parking, Power Transmission, Road, Automotive, Government, Commercial, Power Generation (CCGT)
- Location
- Urbana, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FY22 Sidewalk Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This work includes construction of new sidewalks and a shared use path, curb ramps, curb and gutter, driveway pavement, tree removal, utility adjustments, and appurtenances at six (6) locations which were selected in the fiscal year 2022 Equity and Quality of Life Program. This project is funded with federal Community Development Block Grant funds and local funds. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Urbana |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Power Transmission, Road, Automotive, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
