FY23 Big Bend Water Main Replacement
Sector: Metal • Location: Kirkwood, Missouri, United States of America
Source: Dodge USA
The work consists of replacing approximately 1,700 feet of 6 and 8 pipe with 6 and 8 PVC and ductile iron pipe, designed to be installed utilizing both open-cut and trenchless methods. All necessary service transfers, hydrants, valves, and appurtenances are included. Existing pipe shall be abandoned in place.
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Power Transmission, Government, Steel, Commercial, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Kirkwood, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FY23 Big Bend Water Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists of replacing approximately 1,700 feet of 6 and 8 pipe with 6 and 8 PVC and ductile iron pipe, designed to be installed utilizing both open-cut and trenchless methods. All necessary service transfers, hydrants, valves, and appurtenances are included. Existing pipe shall be abandoned in place. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Kirkwood |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Power Transmission, Government, Steel, Commercial, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
