logo
ProjectClosed

FY23 Citywide Ditching Program Phase 1B

One of 10,000+ projects Taiyo tracks in Texas.

Source: Dodge USA

This project shall provide for the excavation and removal of excess material of approximately 150,710 linear feet (LF) of existing roadside ditches by cleaning and disposing of silt offsite as called out in the plan set and as directed by the City of Beaumont to enhance drainage within the project limits. All ditches are to be cleaned and reshaped in conformance with the lines, grades and typical

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
Location
Beaumont, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about FY23 Citywide Ditching Program Phase 1B

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “FY23 Citywide Ditching Program Phase 1B” is an infrastructure initiative in the Water Supply and Storage sector, located in Beaumont, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project shall provide for the excavation and removal of excess material of approximately 150,710 linear feet (LF) of existing roadside ditches by cleaning and disposing of silt offsite as called out in the plan set and as directed by the City of Beaumont to enhance drainage within the project limits. All ditches are to be cleaned and reshaped in conformance with the lines, grades and typical cross-section shown on the plans. This project also provides for the resetting/repair of select d...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Beaumont

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government, Commercial

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project