FY23/24 Pavement Management Program REBID
Sector: Power Transmission • Location: Saratoga, California, United States of America
Source: Dodge USA
The work to be done consists of supplying all labor, methods or processes, implements, tools, machinery, equipment and materials to for the construction of asphalt concrete overlay, micro-surfacing, repair failed street sections, crack seal, striping, utility adjustment, curbs and gutters, storm drain systems, traffic control and other work not specifically mentioned herein, but which may be requi
- Status
- Closed
- Sector
- Power Transmission, Cement, Road, Waste Processing and Treatment, Water Supply and Storage, Government, Commercial, Power Generation (CCGT)
- Location
- Saratoga, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FY23/24 Pavement Management Program REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be done consists of supplying all labor, methods or processes, implements, tools, machinery, equipment and materials to for the construction of asphalt concrete overlay, micro-surfacing, repair failed street sections, crack seal, striping, utility adjustment, curbs and gutters, storm drain systems, traffic control and other work not specifically mentioned herein, but which may be required as directed by CITY or its designated representative. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Saratoga |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Cement, Road, Waste Processing and Treatment, Water Supply and Storage, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
