FY24 Construct Petroleum Oil and Lubricants POL Complex
Sector: Raw Materials • Location: Great Falls, Montana, United States of America
Source: Dodge USA
The work includes construction of two (2) Aboveground Storage Tanks (AST), two (2) truck filling stations, two (2) truck off -load stations, POL Operations and Fuels Lab building, truck parking for four (4) refueler trucks and associated spill containment at Great Falls Air National Guard (ANG) installation. The project will provide two (2) truck fill stand fueling points. A pressurized hydrant fu
- Status
- Closed
- Sector
- Raw Materials, Oil and Gas, Car parking, Consumer Products, Manufacturing (Industrial), Automotive, Commercial
- Location
- Great Falls, Montana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FY24 Construct Petroleum Oil and Lubricants POL Complex
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes construction of two (2) Aboveground Storage Tanks (AST), two (2) truck filling stations, two (2) truck off -load stations, POL Operations and Fuels Lab building, truck parking for four (4) refueler trucks and associated spill containment at Great Falls Air National Guard (ANG) installation. The project will provide two (2) truck fill stand fueling points. A pressurized hydrant fueling system will supply one (1) pantograph at each refueling point. Fuel storage consists of two... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Montana |
City | Great Falls |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Oil and Gas, Car parking, Consumer Products, Manufacturing (Industrial), Automotive, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
