FY24 Construct Petroleum Oil and Lubricants POL Complex
Sector: Car parking • Location: Great Falls, Montana, United States of America
Source: Dodge USA
The work includes construction of two (2) Aboveground Storage Tanks (AST), two (2) truck filling stations, two (2) truck off -load stations, POL Operations and Fuels Lab building, truck parking for four (4) refueler trucks and associated spill containment at Great Falls Air National Guard (ANG) installation. The project will provide two (2) truck fill stand fueling points. A pressurized hydrant fu
- Status
- Under Construction
- Sector
- Car parking, Road, Oil and Gas, Automotive, Commercial, Consumer Products, Raw Materials, Manufacturing (Industrial)
- Location
- Great Falls, Montana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FY24 Construct Petroleum Oil and Lubricants POL Complex
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes construction of two (2) Aboveground Storage Tanks (AST), two (2) truck filling stations, two (2) truck off -load stations, POL Operations and Fuels Lab building, truck parking for four (4) refueler trucks and associated spill containment at Great Falls Air National Guard (ANG) installation. The project will provide two (2) truck fill stand fueling points. A pressurized hydrant fueling system will supply one (1) pantograph at each refueling point. Fuel storage consists of two... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Montana |
City | Great Falls |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Oil and Gas, Automotive, Commercial, Consumer Products, Raw Materials, Manufacturing (Industrial) |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
