FY24 MVD Stone Requirements
Bid results · Mississippi · Last reported Oct 2024
Source: Dodge USA
The intent of this special notice is to share the most current information available with respect to anticipated stone work requirements within the Mississippi Valley Division (MVD) in the Memphis (W912EQ), Vicksburg (W912EE), and New Orleans (W912P8) Districts during fiscal year 2024. Principle features of work include various construction and repairs to existing dikes, revetments, chevrons, bend
- Status
- Closed
- Sector
- Manufacturing (Industrial), Rail, Commercial
- Location
- Vicksburg, Mississippi, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FY24 MVD Stone Requirements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The intent of this special notice is to share the most current information available with respect to anticipated stone work requirements within the Mississippi Valley Division (MVD) in the Memphis (W912EQ), Vicksburg (W912EE), and New Orleans (W912P8) Districts during fiscal year 2024. Principle features of work include various construction and repairs to existing dikes, revetments, chevrons, bendway weirs, and other river training structures at various locations. Additional land-based constr... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Vicksburg |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Rail, Commercial |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
