FY24 Street Rehabilitation & Drainage Improvement
Sector: Water Supply and Storage • Location: West Lake Hills, Texas, United States of America
Source: Dodge USA
Project includes pavement rehabilitation including approximately 18,300 SY of mil and overlay, 22,700 SY of surface preservation, 600 SY of full depth repair, and crack sealing. Project also includes grading of the channel at Rollingwood Dr. & Las Lomas Dr. intersection to improve stormwater conveyance into the existing culvert, and the addition of a roadside swale, driveway culverts, and valley g
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Road, Government, Commercial, Raw Materials, Manufacturing (Industrial)
- Location
- West Lake Hills, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FY24 Street Rehabilitation & Drainage Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project includes pavement rehabilitation including approximately 18,300 SY of mil and overlay, 22,700 SY of surface preservation, 600 SY of full depth repair, and crack sealing. Project also includes grading of the channel at Rollingwood Dr. & Las Lomas Dr. intersection to improve stormwater conveyance into the existing culvert, and the addition of a roadside swale, driveway culverts, and valley gutters along the east side of North Peak Dr. Project also includes the removal of pavers on Bent ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | West Lake Hills |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Road, Government, Commercial, Raw Materials, Manufacturing (Industrial) |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
