logo
ProjectClosed

FY25 Cave Creek Meter Replacement

Sector: Water Supply and Storage • Location: Cave Creek, Arizona, United States of America

Source: Dodge

To replace approximately 1,600 water meters ranging in size from 3/4 to 1-inch throughout the Town s water system (see Attachment D). The Town has already pre-purchased Neptune water meters for the project. In addition to replacing the old meters, the project will update the Town to an Advanced Metering Instructure (AMI) system. The Town has already installed five data collector sites that will ga

Status
Closed
Sector
Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Manufacturing (Industrial)
Location
Cave Creek, Arizona, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about FY25 Cave Creek Meter Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “FY25 Cave Creek Meter Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Cave Creek, Arizona, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

To replace approximately 1,600 water meters ranging in size from 3/4 to 1-inch throughout the Town s water system (see Attachment D). The Town has already pre-purchased Neptune water meters for the project. In addition to replacing the old meters, the project will update the Town to an Advanced Metering Instructure (AMI) system. The Town has already installed five data collector sites that will gather data from an estimated 80% of the new meters. It is expected that 20% of the meter replaceme...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Arizona

City

Cave Creek

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Manufacturing (Industrial)

Article published date

2025-01-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project