FY25 Electric Vehicle Charging Facility SOURCES SOUGHT
Closed · Texas · Last reported Nov 2024
Source: Dodge USA
This project will provide 22 charging hubs dispersed across Red River Army Depot (RRAD). These hubs will provide an aggregate of 50 Level 2 grid-tied chargers to serve a fleet of about 171 ZEVs. Electric Chargers must meet FedRamp Certification and be compatible with a Wex card for integration. The contractor will be responsible for the installation of EV chargers, utility connections, and trenchi
- Status
- Closed
- Sector
- Commercial, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Electric Vehicles (EVs), Automotive
- Location
- New Boston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FY25 Electric Vehicle Charging Facility SOURCES SOUGHT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will provide 22 charging hubs dispersed across Red River Army Depot (RRAD). These hubs will provide an aggregate of 50 Level 2 grid-tied chargers to serve a fleet of about 171 ZEVs. Electric Chargers must meet FedRamp Certification and be compatible with a Wex card for integration. The contractor will be responsible for the installation of EV chargers, utility connections, and trenching, and will coordinate with RRAD to complete commissioning requirements. RRAD will provide throu... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | New Boston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Electric Vehicles (EVs), Automotive |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
