FY25 Everett Hydraulic Dredging
Sector: Manufacturing (Industrial) • Location: Mill Creek, Washington, United States of America
Source: Dodge
The work includes approximately190,000 Cubic yards (CY) of material from two sections of the Snohomish River Federal Navigation Channel (Sta. 337+07 to Sta. 354+47 and Sta. 65+00 to Sta. 78+00). The material will be dredged by a hydraulic pipeline dredge and placed in Parcel O and Jetty Island.
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial
- Location
- Mill Creek, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about FY25 Everett Hydraulic Dredging
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes approximately190,000 Cubic yards (CY) of material from two sections of the Snohomish River Federal Navigation Channel (Sta. 337+07 to Sta. 354+47 and Sta. 65+00 to Sta. 78+00). The material will be dredged by a hydraulic pipeline dredge and placed in Parcel O and Jetty Island. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Mill Creek |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
